BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Southern Utah Wilderness Alliance - ECPv6.17.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://suwa.org
X-WR-CALDESC:Events for Southern Utah Wilderness Alliance
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20220313T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20221106T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20230312T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20231105T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230318
DTEND;VALUE=DATE:20230319
DTSTAMP:20230124T155903Z
CREATED:20230103T211529Z
LAST-MODIFIED:20230124T155903Z
UID:17560-1679097600-1679183999@suwa.org
SUMMARY:Mill Creek Canyon WSA
DESCRIPTION:The Land \nThe Mill Creek Canyon wilderness study area [WSA] is Moab’s periurban wilderness – magnificent in its scope despite an onslaught of pressures from the nearby community’s thriving recreation industry. The proposed wilderness features a series of canyons cut by perennial streams and ephemeral washes\, lush with riparian vegetation. Pinyon-juniper forest fills out the higher elevations\, above an expanse of Navajo sandstone domes\, fins and arches. \nOff-road vehicle use\, mountain biking\, and popular hiking routes flank the wilderness study area\, putting pressure on boundaries and jeopardizing the integrity of the resource.  \n\nThe Work \nIllegal travel into the WSA will be remediated with a variety of techniques\, including: \n\nRaking\, vertical mulching\, and other surface naturalization strategies;\nPlacing heavy stone and downed logs to naturalize the impacted travel area;\nInstallation of education signage to prevent future incursions.\n\nVolunteers Needed: Prearranged Group\nProject Lead: Jack Hanley\n \n  \n  \n\nItinerary\nA comprehensive itinerary will be provided to registered volunteers. \n\nSaturday\, March 18th \n\nPlease Note: This project is reserved for students participating as part of the University of Utah’s Spring 2023 Alternative Break Program. It is not open to general registration. \n\nProject Rating  \nLevel 2 – Our most common trip incorporates mid- to heavy-lifting\, work in remote landscapes at varying elevations\, an increased diversity of tool use\, and an emphasis on physical fitness and hiking competency. \n\nCamping & Meals \nSpecific location of camping site(s) will be provided in the Welcome Letter sent to registered volunteers. \nSUWA provides elect meals and snacks during the project. Volunteers are responsible for all additional meals not specified in the Welcome Letter during their stay. \n\nVolunteer Responsibilities \nParticipants are responsible for their own food\, water and camping gear as well as transportation to and from the project site(s). Volunteers should plan to be away from camp all day each of the work days. A recommended pack list will be sent along with the project Welcome Letter at least (2) weeks prior to the start date. \n\nRegistration \nA Volunteer Agreement is required for this project. \n \nWhen we have received your form\, you will receive a confirmation e-mail within 5 working days of submission. The confirmation e-mail will indicate whether you have been placed on the “project roster” or a “waiting list.” Individuals on the Waitlist will be contacted if spaces open due to cancellation within (2) weeks of the project start date. \nAt least (2) weeks before the project start date\, registered and confirmed participants will receive a Welcome Letter\, with a comprehensive itinerary\, including: driving instructions\, a Project Map for mobile devices (when applicable(\, a notification about carpools and/or caravans\, and additional information in a Pre-Departure email. You will also receive a direct call from our Project Coordinator to answer any questions you may have. \nIf you have any questions at any point throughout the process\, please do not hesitate to contact us here or by calling  (435) 259-9151. \nAPPLY NOW
URL:https://suwa.org/events/mill-creek-canyon-wsa/
CATEGORIES:Stewardship Project
ATTACH;FMTTYPE=image/jpeg:https://suwa.org/wp-content/uploads/Canyon-Rims-Collage.jpg
ORGANIZER;CN="Stewardship Program":MAILTO:volunteer@suwa.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230328
DTEND;VALUE=DATE:20230401
DTSTAMP:20230227T195610Z
CREATED:20230103T212328Z
LAST-MODIFIED:20230227T195610Z
UID:17562-1679961600-1680307199@suwa.org
SUMMARY:Emery County Wilderness - Spring
DESCRIPTION:The Land \nOn March 12\, 2019\, the Emery County Public Land Management Act was signed into law as the John D. Dingell Jr. Conservation\, Management\, and Recreation Act. As part of that act\, the Emery County Public Land Management Act protected 663\,000 acres of public lands as designated wilderness\, including acreage in Muddy Creek\, Desolation Canyon\, Labyrinth Canyon\, and beyond. However\, in the two years since designation nearly no on-the-ground management has taken place. Standing signs(where they still stand) read “wilderness study area” – having not been updated to identify the true wilderness designation. SUWA staff have worked consistently to move in the direction of proper management and we are pleased to have reached an initial agreement to perform the first of what will be many needed stewardship projects designed to protect and define wilderness boundaries and interiors in the Swell. Join us in our effort! \n\nThe Work \nOur work will focus on wilderness boundary delineation and protection. Nonpermitted travel and camping in protected wilderness areas requires strategic management. We will install proper wilderness boundary signage\, build natural and constructed barriers to travel\, and otherwise clearly delineate protected landscapes from open route travel areas. Strategies may include vertical mulching with large boulders and downed trees/logs\, the building of rock cairn baskets (wired baskets filled with rock to define a border or edge)\, and extensive raking and naturalization of ORV tracks.  \nVolunteers Needed: (10)\nProject Lead: Jack Hanley\nContact: jack@suwa.org\n \n  \n  \n\nItinerary\nA comprehensive itinerary will be provided to registered volunteers. \n\nTuesday\, March 28th through Friday\, March 31st \n\n\nProject Rating  \nLevel 2 – Our most common trip incorporates mid- to heavy-lifting\, work in remote landscapes at varying elevations\, an increased diversity of tool use\, and an emphasis on physical fitness and hiking competency. \n\nCamping & Meals \nSpecific location of camping site(s) will be provided in the Welcome Letter sent to registered volunteers. \nSUWA provides elect meals and snacks during the project. Volunteers are responsible for all additional meals not specified in the Welcome Letter during their stay. \n\nVolunteer Responsibilities \nParticipants are responsible for their own food\, water and camping gear as well as transportation to and from the project site(s). Volunteers should plan to be away from camp all day each of the work days. A recommended pack list will be sent along with the project Welcome Letter at least (2) weeks prior to the start date. \n\nRegistration \nA Volunteer Agreement is required for this project. \n \nWhen we have received your form\, you will receive a confirmation e-mail within 5 working days of submission. The confirmation e-mail will indicate whether you have been placed on the “project roster” or a “waiting list.” Individuals on the Waitlist will be contacted if spaces open due to cancellation within (2) weeks of the project start date. \nAt least (2) weeks before the project start date\, registered and confirmed participants will receive a Welcome Letter\, with a comprehensive itinerary\, including: driving instructions\, a Project Map for mobile devices (when applicable(\, a notification about carpools and/or caravans\, and additional information in a Pre-Departure email. You will also receive a direct call from our Project Coordinator to answer any questions you may have. \nIf you have any questions at any point throughout the process\, please do not hesitate to contact us here or by calling  (435) 259-9151. \nAPPLY NOW
URL:https://suwa.org/events/emery-county-wilderness-i/
CATEGORIES:Stewardship Project
ATTACH;FMTTYPE=image/jpeg:https://suwa.org/wp-content/uploads/Emery-Wilderness-Collage.jpg
ORGANIZER;CN="Stewardship Program":MAILTO:volunteer@suwa.org
END:VEVENT
END:VCALENDAR